smccormick Posted August 10, 2017 Author Posted August 10, 2017 <embed src="https://3dwarehouse.sketchup.com/embed.html?mid=fe50996d-a643-4f26-ab96-585436fd30f4&width=580&height=326" frameborder="0" scrolling="no" marginheight="0" marginwidth="0" width="580" height="326" allowfullscreen></embed> Quote
smccormick Posted August 25, 2017 Author Posted August 25, 2017 Mold, layup and part for forward hatch ring/gutter. Quote
Lotus Posted August 25, 2017 Posted August 25, 2017 Wow that is awesome !! and a fantastic idea too !! A lot of extra work but it pays off !! Quote
smccormick Posted September 8, 2017 Author Posted September 8, 2017 I have photographic evidence that I "throw myself into my work". Quote
Hirilonde Posted September 8, 2017 Posted September 8, 2017 When I had my contracting business I told my employees they weren't allowed to bleed on the work in progress. Go outside to bleed. Quote
smccormick Posted September 9, 2017 Author Posted September 9, 2017 I like your style. I would have moved along but it was hot and I had epoxy going off and a cluster fork going on with my clamping blocks. Rushing, it'll get me every time. Just glad I didn't have a saw in my hand. Quote
smccormick Posted October 17, 2017 Author Posted October 17, 2017 Forward 2/3's of the ceilings planked, and glassed, and rough faired, 1 Quote
thull Posted October 17, 2017 Posted October 17, 2017 Wow!! Wow!! Helluva a project! Work looks great...looks like you've thought everything out....GL Quote
smccormick Posted October 19, 2017 Author Posted October 19, 2017 The rest of the hatch ring moulds and the parts. Quote
smccormick Posted October 19, 2017 Author Posted October 19, 2017 Sole installation locations readied. Sticking them in. One left to do. Quote
smccormick Posted October 22, 2017 Author Posted October 22, 2017 All the hatch rings installed. Sole and transom glassed Quote
lenm Posted October 23, 2017 Posted October 23, 2017 You are doing a great job with the hatches and waterproofing. Do you have an ideas how to glass the edges of the exposed bulkheads? I though about vac bagging any sharp edges to avoid the need to round them off, then build them up again (e.g. chine edges). Quote
smccormick Posted October 23, 2017 Author Posted October 23, 2017 I've knocked them off then put them back on. When I looked at the cost and time to bag everything vs. radiusing, I just couldn't justify it. I have, on the other hand, glassed internal, non-structural, low wear edges with a strip of glass. I don't have any problem with running the glass up the sides of a piece and then applying another piece on the edge/face. I am just careful when I sand to avoid going through the sharp edge. I wouldn't do this with hull bottom/chine areas, but bulkhead edges I wouldn't hesitate. Quote
smccormick Posted November 3, 2017 Author Posted November 3, 2017 Forward hatch complete... mostly. Ceilings complete. Quote
HighDesert Posted January 12, 2018 Posted January 12, 2018 I just looked at your rowing wherry...It's incredibly beautiful. Love following your OC256, too. 1 Quote
smccormick Posted January 14, 2018 Author Posted January 14, 2018 Thanks, glad you're following along. Quote
smccormick Posted February 4, 2018 Author Posted February 4, 2018 The long and tedious task of fairing the interior edges and corners is nearly complete. A few coats of 302 high build added to create the illusion of progress. Quote
lenm Posted February 4, 2018 Posted February 4, 2018 I've been hanging out for an update - looking really good! I like the clean interior edges. Is that teak on the comings? re the 302, are you also using 'awlfair' for the deeper depressions? can the awlfair go straight onto raw FRP or require epoxy primer underneath? Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.