Overboard scuppers (incomplete, obviously) and a livewell. The livewell was built of gelcoat and glass over a mold to fit in the transom well.

IMG_3417.jpg

IMG_3830.jpg

Posted

5/4 inch teak coverboards. These were installed with gflex epoxy, no fasteners and the 22 ft radius bend was quite a challenge.

IMG_4772.jpg

IMG_4835.jpg

IMG_4842.jpg

IMG_4859.jpg

IMG_4865.jpg

Posted

Sapele toe rails and out the door!

 

We still have lots to do. Hardware, engine and electronics are all here and ready to go. There are a lot of small details, including all of the hardware cutouts to do before painting begins. I hope that I only have a 2 to 3 months to go. For those interested, I will keep posting.

 

Thanks

 

IMG_4860.jpg

IMG_4921.jpg

IMG_5210.jpg

IMG_5233.jpg

  • Like 1
  • 1 month later...
  • 3 months later...
Posted

Final fairing and awlgrip primer outside, ready for topcoat. We just finished final fairing inside and primer will go on as soon as the weather is right. Im finally getting close to having a boat and look forward to rigging and the big splash.

IMG_5537.jpg

IMG_5538.jpg

IMG_5539.jpg

IMG_5540.jpg

  • Like 2
  • 7 months later...
Posted

A quick update for anyone interested. The paint job is done! Most hardware and wiring is finished. I'll take her for an outboard motor this weekend and then a test float will follow.

 

This has been a much longer project than originally anticipated but also very fun and rewarding.

 

 

IMG_0025.jpg

IMG_0283.jpg

IMG_0285.jpg

IMG_0292.jpg

IMG_0297 (1).jpg

IMG_0295.jpg

  • Like 3
Posted

Thanks for the comments. I'm not sure about the weight but will wait until after the engine is on to adjust the trailer.

 

The engine goes on this week and , weather permitting<,a test float this weekend.

  • Like 1
  • 2 weeks later...
Posted

Test Launch yesterday.  I was nervous about the waterline because of the changes made along the way and because of the tendency for novices to overbuild. I floats nicely about 2" below the waterline with a 25% fuel load.  The engine proved too high and we had  too much prop pitch (20) , so we are making some adjustments.

 

 

IMG_0332.jpg

IMG_0333.jpg

IMG_0334.jpg

IMG_0335.jpg

IMG_0338.jpg

IMG_0339.jpg

  • Like 1
  • 3 months later...
Posted

Just an update. We finished getting an aluminum T-top installed with the help of High Speed Welding in Wilmington, NC. They did a nice job,

 

I have put about 30 hours on the engine getting used to how it handles and working bugs out of the software. I'm almost there. We went out in the harbor recently when it was blowing 16 kts G26 kts for a surprisingly dry and stable ride.

 

I have yet to put in the decking material but have decided to go with Seacork. Teak is too heavy (and expensive) and I cant bring myself to put fake teak or paint on this pretty wooden boat. Does anyone have experience with Seacork?

 

I plan to venture out to some of the nearshore reefs in the near future and see if I can put some fish in this boat.

 

 

IMG_0178.jpeg

IMG_0217.jpeg

IMG_0338.jpg

Resized_20240706_073922_979081847486091.jpeg

  • Like 2
Posted

Adios, congratulations on getting your beautiful boat in the water. I looked back over your impressive build thread. Thanks for all the pictures and thanks for your diligence in sticking with the project in good spirits. Enjoy the boat.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.