Jump to content

Recommended Posts

Posted

I Was wondering if anyone has a fix for the peak halyard setup. According to the plans the point at the mast were the peak halyard hooks to the gaff via two pulleys on the same eyebolt. At this point I keep getting a jam up when the two pulleys start touching each other under tension. Has anyone else had this problem?


Posted

I tried the 2 pulleys and found they didn't work properly and went with a double pulley and there was no problem. I built a spreader for the stays also and found that I need to get a wider one as it still jams up sometimes.I think 9" is the minimum that you need to keep the gaff from catching on the stays.

Posted

Here's a pic of how Peter has his Weekender set up now.

Mastheadrig.jpeg

As you can see, we're using a double pulley for the throat halyard and running a two-to-one purchase now. You could use a single w/becket.

At the deck we've got this going now:

DeckRigging.jpeg

The same set-up is used on the starbord side for the peak halyard so it can run back to the cockpit side.

Mike

Posted

I just used one block, with no problems, It hauls straight up as long as you keep the gaff low or level (haul it up last), this helps stop the mast hoops binding. the beauty of one pulley is that theres less rope involved (the halyard can be shorter) and when the gaff comes down ,you have 1 rope not 3 going up.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.



×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.