Jump to content

Recommended Posts

Posted

Date: Monday April 14th 2008 (4/14/2008)

Start time: 3:00am CDT

End time: 5:00am CDT

Devices: fcr02.dal01

Location: dal01

Duration: 15 minutes

Network Engineers will be performing upgrade maintenance on the router that our server connects through on Monday April 14th starting at 3:00am CDT. During this time, engineers will be swapping out the existing supervisor engines (SUP720-3BXL) with new Cisco best of breed supervisor engines (VS-S720-10G-3CXL) on FCR02.DAL01. As this router provides direct connectivity to our servers, public internet connectivity will be unavailable at various points during the above maintenance window. Although we expect this upgrade of the supervisor engines to only take approximately 15 minutes, we have scheduled a maintenance window from 3:00am to 5am CDT.


Posted

I'll bet its hard to fall asleep on the job when you work the graveyard shift ... everyone is watching out for you sleeping!  At least during the day, you can close the door, cradle the phone on your neck, swivel your chair away from the window, lean back and nap without any one noticing. 

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.



×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.