wkisting Posted August 18, 2011 Report Share Posted August 18, 2011 I don't have anything to scan the sheet at the moment, but Wes' site has some good pictures of the rigging on http://www.roguepaddler.com/cs20q.htm. His mainsheet setup looks pretty much like what my plans show. Yep, my arrangement is very close to the plan sheet specs. I setup the control lines for the main (halyard, downhaul, and snotter) to run back within arm's reach of the helm also. Quote Link to comment Share on other sites More sharing options...
PinoyPiper Posted August 18, 2011 Author Report Share Posted August 18, 2011 is that the halyard for the main coming back? it's the main sheet coming from a standup block on the thwart. Quote Link to comment Share on other sites More sharing options...
PinoyPiper Posted September 13, 2011 Author Report Share Posted September 13, 2011 The hardware that came from B&B came with one of these: RF25109 Can anyone tell me where it goes? it's a 20mm block so it's really small. I think I have most of the stuff figured out except for this one. Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.