Jump to content

Recommended Posts

Posted

photo#5193923956557332450

Well we got the boat outside yesterday and started rigging the sails. I laced the main on because I could not find mast hoops (PVC couplers) that fit over my hinges. I think I might try loops made out of parrel beads.

We had a slight breeze which was not able to overcome the resistance of the clubfooted jib sheet through the blocks. I may try to reduce the size of this sheet from 3/8" to 1/4" or 3/16", it might go through the blocks easier.

Found lots of new little projects to work on before launching! Still shooting for the first week in June (this year!!)

Yeah I know I may have said that a year or two , (or three) ago ;) 

joel

I thought I posted a picture but I guess I still don't know how . Here is a link to one

http://picasaweb.google.com/jsacho/SVIslandGirl/photo#5193923956557332450


Posted

That's one great looking boat, Joel.

3/8" line is overkill for the jib sheet.  You'll notice significant improvement with 1/4" line. 

I have laced my mainsail to the mast for years, and it works just fine.  I have not tried the spiral lacing that you used, but have found the back-and-forth method (posted on this board several times) to be very easy to use.  The trick is to get some very, very pliable line.

Bill

Posted

Joel, If you want beads, I have a bag full of them. We can also cut some hoops out of ply  and trim them up with my lathe if you would like.  I went with the ply hoops and IMHO it was a big step up from the beads.  Rounded over with a router and sandpaper, soaked in Lind seed oil and buffed out.

How's that splicing going? :)

Posted

Thanks for the compliments guys. I don't think I would have ever got this far without the support of this group.

Jake, I found some 5" schedule 40 couplers for mast hoops. I will pick them up today along with the rest of the stainless screws I need. I will take you up on the beads for the gaff, thanks.

The splicing is done. I did the eye for the main sheet yesterday. I did have one mishap while splicing a couple of weeks ago. I cut my hand bad enough for a few stitches (actually they used super glue and a splint) that worked out ok but I couldn't move my index finger for about 2 weeks.

I did have a problem with the fid. I got the cover tail tangled up in the core and couldn't get it out. I ended up cutting the core (and the loop on the fid) to get it apart. Found some waxed twine and repaired the fid, good as new  ::)

Still looking to launch the first week in June, hope you can make it.

joel

Posted

I installed my new mast hoops, the smaller jib sheet, and rigged the mainsheet. We're down to a very small punchlist...... should launch on schedule!

The mast hoops are a little big, but the main sure goes up nice and easy. I took one of the blocks out of the jib sheet rig. The line runs much easier. I can't imagine needing the extra purchase with this small jib.

Here is one more picture

http://picasaweb.google.com/jsacho/SVIslandGirl/photo#5196910227435198386

Joel

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.



×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.