Dave R1 Posted June 29, 2003 Posted June 29, 2003 I was working on the rigging yesterday and came up with a question. The plans show the halyards belayed on cleats at the base of the mast. I have run the peak and throat halyards back to the cockpit on the cabin roof but I'm not certain whether I should bother bringing the jib halyard aft as well. Any opinions? Quote
Mike Pennington Posted June 29, 2003 Posted June 29, 2003 Can't hurt, some guys have rigged a down haul too. Quote
Knut Posted June 29, 2003 Posted June 29, 2003 My answer is very simple: Don't hesitate for a second. Take the jib halyard back to the cockpit and install also a jib downhaul that can be operated from the cockpit (especially if you plan to use a larger jib than plans, which is also recommendable). This will give the opportunity to hoist and strike the jib without running around on deck. You will find that this is a great advantage, especially if the wind and the waves pick up a lot. Single handed sailing is another reason to use this solution. I am in no doubt, but it is your choice, of course. Quote
capt jake Posted June 30, 2003 Posted June 30, 2003 Yup, I took mine aft as well. Simpleto do and no going forward to raise or lower (though I wouldn't know as i haven't had it wet yet! ). jake Quote
SeaEagle Posted June 30, 2003 Posted June 30, 2003 I'm still in the building stages - but based on previous experiance I'm definately planning on running the Jib Halyard and Jib Downhaul aft. On my Elliot 5'9 I had both back to the cockpit, and an additional advantage I found with that boat was that I could clip the Jib Halyard to the Jib Downhaul, cleat off the jib halyard, and winch the mast using the downhaul. I don't know if this will be possible, or even necessary) with the Weekender, but it worked well with the Elliot. I think I remember that Capt. Jake may have set up something similar for his dry boat :wink: Quote
T. Nelson Surbrook Posted June 30, 2003 Posted June 30, 2003 Why not just go all the way and install roller furler? I started out using the rig as discribed in the plans. After trial and error I have ended up with a system that works really good. It just takes a while. Quote
Dave R1 Posted June 30, 2003 Author Posted June 30, 2003 Thanks for the suggestion guys. I guess I need to drill a few more holes in the boat. Nelson, I would like to add a roller furler and might do so next year. The goal of an August 23rd launch is looming over my head and I have plenty to do without adding that. Here's a shot of the boat from yesterday. All rigged with that inexpensive braided stuff from Menard's so we could measure to buy the right stuff. I couldn't resist putting up the jib, though I think it is riding a bit higher than it should. I would have put the main up as well but it was windy enough I was afraid the boat would either tip over or sail off down the street. With casters on all four corners, I imagine the leeway would be atrocious. Quote
Mike Pennington Posted June 30, 2003 Posted June 30, 2003 Looking good and getting closer. Now, call in sick and get back to work on your boat Quote
JTam Posted June 30, 2003 Posted June 30, 2003 Yes, I'd say you should run the jib halyard back to the cockpit. This is the first sail I douse when the wind starts to build. The cleats I used on the mast were open based, so I used what normally would have been the jib cleat on the mast as a turning block, and ran the halyard to a cleat to the top of the cabin; as you did for the main halyard. I also put a jib downhaul on this week and tested yesterday... it worked great especially with the plastic hanks on my jib. I put a small cheek block on the bowsprit just forward of the forestay eye, and ran a line from there back to just forward of the coaming where I mounted a small cleat. A couple of fairleads to keep this line from getting fouled and I was done...about 30 minutes of work. Quote