Jump to content

Recommended Posts


Posted

Now that I'm home I can check the book. It indeed reads 150' rode, 3/8"size, with a 3/16" sized chain at 10' long (1/2' chain per LOA). It recomends either twisted or 'double-braided' nylon line, the former for its elasticity and the former for its resistance to twisting and kinks. It should have a thimble spliced on an end and shackle to attach it to the chain. Keep the shackle pin lubricated so it does not sieze but put a cable tie through the hole in the pin to prevent it from it working out. The book recomends making marks a little further apart than I did, 20'.

Posted
the former for its elasticity and the former for its resistance to twisting and kinks.

That should read "the former" and "the latter"

(1/2' chain per LOA).

6" per foot LOA

you also might want to think about puting a swivel at the anchor and also having a storm anchor or a float to help absorb shock in rough conditions.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.



×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.