Jump to content

Leaderboard

Popular Content

Showing content with the highest reputation on 08/27/2018 in all areas

  1. Aug 27 Update: We've got some momentum now. It feels good to glue in parts. We spent a good part of Sat. and Sun. working on the boat. Earlier in the week Taylor filleted and taped the aft side of BH5 into place and on Sat we installed the port side of BH4 and got all of the seams between BH1 and BH2 taped. Below, BH4 is split into 3 pieces in the updated version of the CS-20 Mk3. This allows the center panel to be installed after the ballast tank is glassed like a bathtub which will hopefully eliminate the possibility of any leaks. To the left, the BH is cutout and the space behind it is storage at the end of the port bunk. To the right the panel is solid because it will be the front side of the Cooler box. We're planning to copy Graham's Cooler design. The right side panel is normally also cutout but I cut a new one out of scrap. The hole could have been filled in with scrap but i had a big enough piece so i just remade it. Here I am dryfitting the 3 together while gluing in the port side part to keep everything square and lined up. A clamp was needed at the top to pull in the gunwale just slightly. Had about 1/8" gap between the hull side and frame in the middle of the panel which is normal. We always leave gaps like that alone so as not to "dimple" the hull. Below: a view from the stern. BH5, BH4, BH3 (with companionway cutout). Note the gap for the CB trunk on the port side and a thin 1/4" gap on the stbd side of BH4 for the starboard cockpit side. Below: A view of the keel between BH1 and BH2. All the glassing and taping is done in this area. Next up will be installing the cleats to support the forward locker top and final epoxy coats inside the locker. I'll also be installing an inspection port in the bottom of the BH1 to gain access to the space underneath the anchor locker well. On Sunday we installed the pre-coated and sanded starboard cockpit side panel. The tabs and wedges worked excellent to pull the part down tight to the hull. Taylor got straight to work filleting and taping the outside joint. Below: At the same time, we installed the starboard piece of BH4 and glassed it in. This box completes the sides of what will be our cooler space. Next in here will be blocking in blue insulation foam. The center panel of BH4 was again used to maintain the space and keep the frames square and true. It is not glued in yet and won't be until after the ballast tank is glassed. Meanwhile, I've got the centerboard trunk (also the port cockpit side) coated and almost ready to install. I still need to drill the CB pivot hole out. I plan to make a 90 jig for the drill and drill it by hand rather than try to line it up on the drill press.
    2 points

Supporting Members

Supporting Members can create Clubs, photo Galleries, don't see ads and make messing-about.com possible! Become a Supporting Member - only $12 for the next year. Pay by PayPal or credit card.




×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.