smccormick Posted November 13, 2015 Report Share Posted November 13, 2015 I received the plan package for Ocracoke 256 hull #2 about a month ago. After about 2 weeks of studying and materials gathering, I began cutting frames. The temp frames are all cut and edge sanded, the transom is glued up and the permanent frames are all rough cut with about 30% +/- edge sanded. Here's some photos of the progress. A link to all the project photos going forward will be here Laying out nests Temp frames cut and edge sanded Transom Jig, I thought I should put a little effort into lofting Dad helping out Quote Link to comment Share on other sites More sharing options...
Skeg Posted November 14, 2015 Report Share Posted November 14, 2015 That's a heck of a crown in the transom, looking forward to watching your progress, thanks for taking the time to post pics. Quote Link to comment Share on other sites More sharing options...
smccormick Posted December 22, 2015 Author Report Share Posted December 22, 2015 So I haven't put a lot of effort moving this forward in the last month (life got in the way), just refining shapes and comparing parts to drawings. Today I was ready to glue some frame parts together and spent the afternoon doing just that. Afterward I was walking through parts checking on alignment before they started to kick and for some reason grabbed the hardener and started reading the label. Hey look there, that fast hardener is 1 to 4 not 1 to 2. Fook. What a waste of a day, came in the house to sulk. This is far from my first rodeo and I know better. Spent the better part of the next day taking everything apart and cleaning the mess, wasn't that special. Quote Link to comment Share on other sites More sharing options...
Slappy Posted January 3, 2016 Report Share Posted January 3, 2016 Hey there smccormick, What part of California are you in? I'm considering building a 256 and if I do, I'd love to see your build. Thanks Quote Link to comment Share on other sites More sharing options...
smccormick Posted January 4, 2016 Author Report Share Posted January 4, 2016 Hey there smccormick, What part of California are you in? I'm considering building a 256 and if I do, I'd love to see your build. Thanks Sacramento area. If you're in the area and do build, I may have a transom jig you can borrow. Quote Link to comment Share on other sites More sharing options...
smccormick Posted January 9, 2016 Author Report Share Posted January 9, 2016 While not the real reason for my lack of progress, I have spent an inordinate amount of time looking for 5/4 clear pine (5/4 anything) in this area. I started looking for this material while in BC this past summer and contacted every lumber yard along the I5 corridor from there to Sacramento. Since this corridor is known for it's timber, I believed my task would be simple. I had picked up hard to find lumber in Wash. and Ore. before, but this time, nothing. This past week I had pretty much given up hope. The project needed to move on, I was going to be laminating 4/4 for all the ribbands, clamp and log. While my search was taking its last dying breaths, I thought hey, everything in Tahoe is covered with mill finished clear, lets give a yard up there a call. Lo and behold, there was a place with it in stock and reasonably priced! While the yard is a two hour drive away, it just happens to be five minutes out of the way from the mountain I ski at and this time of year I ski a couple days a week. So this week I'll be staying an extra day and doing a bit of man shopping at the local yard. Problem solved and surprisingly convenient. All the frames were glued up this week. While I was in the process of laying out all the parts I realized that I was wasting a ton of time detailing every part, when in most cases, I could detail one or two per frame, then use it as a template for the rest. So I glued up blanks as doublers then ran a flush trim bit around. So much easier. Spent a good portion of my time checking my parts against the drawings and fine tuning. Part accuracy is looking pretty good, but certainly not the <.001" that I would prefer. Quote Link to comment Share on other sites More sharing options...
smccormick Posted January 18, 2016 Author Report Share Posted January 18, 2016 After all the excitement and hope about 5/4 clear pine, I arrived at the yard only to get the "tilted head, confused dog look" from the guys from behind the counter. "who did you talk to? We don't have that, only in knotty, Oh I'll bet it was Ben. Managed to NOT blow a gasket. Moved the conversation along and they found out they could source it, but at a 50% premium over the knotty, of course. Normally, I wouldn't have given them the business, because they wasted my time, but a this point.. The stock should be in on Tuesday. At least the trip wasn't a complete waste of time, skiing was great. Quote Link to comment Share on other sites More sharing options...
smccormick Posted January 30, 2016 Author Report Share Posted January 30, 2016 Made a small amount of progress. Have my ribband stock on hand, fabricated the keel/stem assembly, all the stations/frames cut and fine tuned, jig assembled, leveled and staked. Stringers need to be completed and keel/stem need to be bearded then it's off to standing up frames. Here's a picture of keel material. It's just beautiful ~20 rings to the inch on the right side of the plank. I just want to varnish it and hang it on the wall. Yes I'm a wood geek. Stem glue up. Keel assembly dry fit Keel glue up. Keel and a couple stations erected. Quote Link to comment Share on other sites More sharing options...
meester Posted January 30, 2016 Report Share Posted January 30, 2016 Hi smccormick, did you say "wood geek?" Could be worse. www.talaricohardwoods.com/woodporn.htm. (Despite the title, it's safe.) Now, back to the shop. Bob Quote Link to comment Share on other sites More sharing options...
smccormick Posted January 31, 2016 Author Report Share Posted January 31, 2016 Hi smccormick, did you say "wood geek?" Could be worse. www.talaricohardwoods.com/woodporn.htm. (Despite the title, it's safe.) Now, back to the shop. Bob Great stuff, spent way too much time looking over their selection. Quote Link to comment Share on other sites More sharing options...
smccormick Posted February 5, 2016 Author Report Share Posted February 5, 2016 Fold tab A into slot B and poof there's boat Jig. Quote Link to comment Share on other sites More sharing options...
smccormick Posted February 16, 2016 Author Report Share Posted February 16, 2016 A little progress in the last 2 weeks. 1 Quote Link to comment Share on other sites More sharing options...
CJD Posted February 18, 2016 Report Share Posted February 18, 2016 Looking good. Are you still dry fitting or are the frames glued together? Quote Link to comment Share on other sites More sharing options...
smccormick Posted February 19, 2016 Author Report Share Posted February 19, 2016 Looking good. Are you still dry fitting or are the frames glued together? The photos above show dry fitting. I have moved on to installing them permanently. Quote Link to comment Share on other sites More sharing options...
smccormick Posted February 19, 2016 Author Report Share Posted February 19, 2016 Here's some photos from today. I have been gluing ribbands, log and sole ledger up to this point. It has been going slower than predicted between scarfing all the longitudinals and having only enough clamps to do one part per side per gluing session. Getting bored with that, so I went out tonight and picked up enough clamps to double my reach. So much for starting the planking this week. I love lying to myself. Ply on starboard bottom is some left over 4mm from another project that I was using to get a feeling for fairness. It has no application in this build. Quote Link to comment Share on other sites More sharing options...
Miyot Posted February 19, 2016 Report Share Posted February 19, 2016 Looking real nice. Quote Link to comment Share on other sites More sharing options...
Alan Stewart Posted February 19, 2016 Report Share Posted February 19, 2016 Love the way those stringers look laYing in there. Quote Link to comment Share on other sites More sharing options...
Skeg Posted February 22, 2016 Report Share Posted February 22, 2016 Looks good, how has it been getting the jig lined up fair? Quote Link to comment Share on other sites More sharing options...
smccormick Posted February 22, 2016 Author Report Share Posted February 22, 2016 Looks good, how has it been getting the jig lined up fair? It wasn't bad getting it faired, I installed all the stations/frames back to front with a laser level and plumb bob/center line shooting down the whole assembly using the wl on the stem as an initial elevation. After I installed the stringers and bracket, I went back and re-leveled all the stations and corrected any hook (thwart) in the stem/keel/stations. It was all within ~1/16, so only small corrections where needed, followed by diagonal bracing to hold the positions. Then I threw that piece of 6 mil up there to get a feeling for gross fairness. It looked good so I started hanging longitudinals. The largest road block to progress is my incessant need for precision. I will fret for hours before making some cuts or part installations trying to foresee anything that will come back to bite me later or worrying that it won't be perfect. Quote Link to comment Share on other sites More sharing options...
Miyot Posted February 22, 2016 Report Share Posted February 22, 2016 A lot of time is spent thinking, but I think it is time well spent. Quote Link to comment Share on other sites More sharing options...