Jump to content


Forum problems? Contact Frank • Like our Facebook Page

Photo
- - - - -

Curlew build log, part 2


This topic has been archived. This means that you cannot reply to this topic.
No replies to this topic

  #1 AndrewB

AndrewB

    Advanced Member

  • Members
  • PipPipPip
  • 64 posts

Posted 14 January 2013 - 08:57 PM

Unfortunately the forum software doesn't let me bump up my old build log. So here is the old link: Curley build log.

 

To sum it up, I have built the frame, tied everything up except the floor boards. I built the mold for the coaming. Then summer came along and life got busy. Now that I have a bit more free time, I am starting the kayak project again.

 

2013-01-14_21-37-46_329.jpg2013-01-14_21-37-25_205.jpg

First layer I don't think I got enough glue in the first joint, since the glue didn't overflow like it did on the second layer. You can see the butt joint with the 2nd layer on this second picture. So far I haven't had to use a heat gun to bend it, just enough clamps.