I had a fairly productive day after a rough start. I ended up removing both Bulkhead 1 and the Temp frame and tightening everything up before I put them back in. It was definitely not fun getting bulkhead 1 back in, but it is there now and I have tight seams.
I got the inwales installed and most of the seams tabbed before I ran out of daylight. I still had the hollow in the bottom that I mentioned yesterday, but I found a way to work around it. I made a jig to pull the hollow until I get all the seam tabbed and taped. The hollow is on the 1/4" section of the bottom where I will eventually have to put stringers, so everything should work out in the end.